Roe Timberframe provides a complete timber frame package—built around accurate estimating, robust detailing, controlled manufacturing and dependable delivery to site. Get a Quote View Our Process

What we do

An end-to-end timber frame service

From first enquiry to final installation, our team supports developers, contractors and architects with a single point of responsibility across design, manufacture, transport and construction.

About us

Modern Methods of Constructon

MMC Spectrum

A range of approaches with spans off site, near site and on-site pre-manufacturing, process improvements and technology applications. 

A process built for Certainty

Estimating

fast, clear pricing and scope

Design

coordinated, buildable information

Manufacturing

controlled production and checks

Transport

planned logistics and site-ready loads

Construction

experienced installation teams

Quality Control

documented checks at each stage
Explore Our Process

projects

Proven on live sites

Badocks Wood Primary School

Badocks Wood Primary School

October 29, 2026

Design, supply and installation of the complete timber frame package for a new school building and an extension to the existing school. The timber frame works were completed during the half-term holiday, with a carefully coordinated programme to avoid disruption to the school and its pupils.

Premier Inn Extension, Beaconsfield

Premier Inn Extension, Beaconsfield

October 29, 2026

Design, manufacture and installation of the timber frame structure for a new two-storey extension to the existing Premier Inn in Beaconsfield. Our package incorporated a fire-rated breather membrane and carefully coordinated junction detailing to protect the existing building during construction.

Bishops Lane, East Sussex

Bishops Lane, East Sussex

October 29, 2026

Design, manufacture and installation of timber frames for 68 homes, comprising houses and two blocks of flats. The project also included a fully tiled roof lift. The complete roof structure was assembled at ground level with integrated lifting beams, allowing the roofing contractor to install the felt, battens and tiles before the finished roof was

Duncombe Barracks and Burnholme Grove, York

Duncombe Barracks and Burnholme Grove, York

October 29, 2026

Design, manufacture and installation of 112 homes built to a Passivhaus specification across two developments in York. Our package included a twin timber frame wall system, floor and roof cassettes, and all associated airtightness detailing to the timber frame structure, supporting the homes’ demanding energy performance requirements.

Knights Reach, Dartford

Knights Reach, Dartford

October 29, 2026

Design, manufacture and installation of timber frames for 438 houses, with a comprehensive package including wall panels, floor cassettes, roof trusses, structural steelwork, safety deck, roof cassettes, fascia and soffit. Deliveries were coordinated to meet a demanding site programme, reaching up to 20 houses per month while maintaining high standards of quality and workmanship. Our

Medway Student Halls

Medway Student Halls

March 3, 2026

A £4.5M JCT design & build scheme which involved the creation of 144 student bedrooms with associated living rooms, kitchens and a wardens home. Constructed in three blocks of four storeys each, Provian & GDM looked at both metal & timber frame, and concluded that the latter had the advantage “both financially and in programme.”

Ready to price your Timber Frame Package?

Request a Quote